This stage, shared with the EuroVelo 6 route, takes you along a provisional cycle route through pretty Burgundian hills. Note that the way is along quite steep little roads and should only be tackled by experienced cyclists. You can avoid this difficulty by taking the train from Chagny to Montchanin.
Route
The provisional cycle route is signposted but is only for experienced cyclists. Avoid the D 974 road beside the canal as traffic along it is very busy up to Montchanin. Numerous TER regional trains go from Chagny to Montchanin, Monceaux-les-Mines and Paray-le-Monial.
Gradients and elevation
Ascents: 90m
Descents: 16m
Lowest point: 234m
Highest point: 314m
Slope breakdown
1km gentle descent (-5% to -1%)
16km flat (-1% to 2%)
1km climb (2% to 5%)
1km gentle descent (-5% to -1%)
16km flat (-1% to 2%)
1km climb (2% to 5%)
Slopes measured over 500 m
Road types
15km (84%) of cycle paths
3km (16%) of shared roads
- Cycle path
- Routes reserved for cyclists and pedestrians (greenways, cycle tracks, towpaths), separated from cars for maximum safety.
- Shared road
- Quiet minor roads with little traffic (unless otherwise stated in the stage details). Shared with cars (stay alert).
- Not specified
- Data unavailable or being assessed. Please refer to the detailed stage description.
- Provisional
- Section on a road or cycle path awaiting better-quality facilities (see stage details).
Surface
16km (91%) of smooth surface
2km (9%) of undetermined surface
- Smooth
- Asphalt, tarmac or smooth concrete. Optimal comfort.
- Rough
- Fine gravel, compacted stabilised surface or worn tarmac. Less comfortable, vibrations possible.
- Natural
- Dirt, grass, roots or stones. Under 5%: short sections with little impact. Higher percentage: route suited to mountain or gravel bikes only.
- Not specified
- Data unavailable or being assessed. Please refer to the detailed stage description.
Road types
15km (84%) of cycle paths
3km (16%) of shared roads
- Cycle path
- Routes reserved for cyclists and pedestrians (greenways, cycle tracks, towpaths), separated from cars for maximum safety.
- Shared road
- Quiet minor roads with little traffic (unless otherwise stated in the stage details). Shared with cars (stay alert).
- Not specified
- Data unavailable or being assessed. Please refer to the detailed stage description.
- Provisional
- Section on a road or cycle path awaiting better-quality facilities (see stage details).













